manufacture-manufacture,factory,supplier from China

(Total 24 Products for manufacture)
Basic InstructionIt is mentioned that due to the fact september 2021, the low-carbon era control team of beijing college of generation has taken the lead and cooperated with eight units, including the countrywide velocity skating hall, tsinghua college, beijing college of aeronautics and astronautics, hefei institute of material sciences of the chinese language academy of sciences, shandong guoshun lvjian generation co., ltd., beijing zhongchuang carbon investment era co., ltd., beijing inexperienced trade co., ltd.
  Contact Now
InstructionFlue gas desulfurization and denitration generation is a boiler flue gasoline purification technology completed to the chemical industry of multi nitrogen oxide and sulfur oxide technology. nitrogen oxides and sulfur oxides are one of the foremost property of air pollutants. therefore, the software of this era has many benefits for ambient air purification.
  Contact Now
InstructionFlue gas desulfurization and denitration technology is a boiler flue gas purification technology applied to the chemical industry of multi nitrogen oxide and sulfur oxide generation. Nitrogen oxides and sulfur oxides are one of the main sources of air pollution. Therefore, the application of this technology has many benefits for ambient air purification.
  Contact Now
InstructionFlue gasoline desulfurization and denitration technology is a boiler flue fuel purification technology carried out to the chemical industry of multi nitrogen oxide and sulfur oxide generation. nitrogen oxides and sulfur oxides are one of the principal assets of air pollutants. consequently, the application of this era has many advantages for ambient air purification.
  Contact Now
Basic InstructionIt is reported that since September 2021, the low-carbon technology management team of Beijing University of technology has taken the lead and cooperated with 8 units, including the national speed skating hall, Tsinghua University, Beijing University of Aeronautics and Astronautics, Hefei Institute of material sciences of the Chinese Academy of Sciences, Shandong Guoshun Lvjian Technology Co., Ltd., Beijing Zhongchuang carbon investment Technology Co., Ltd., Beijing Green Exchange Co., Ltd.
  Contact Now
Assembled steel structure:Assembled steel structure, also known as modular steel structures, offer several advantages in the field of construction. The detailed advantages of Assembled steel structure in buildings are as follows: pre-assembled in a factory-controlled environment, allowing for faster construction.
  Contact Now
Basic InstructionWe completely remember the necessities of residential features and clean decoration on this restricted space of the residence, and there is now not the conventional metal structure and some concrete shape of the convex beam phenomenon. after the optimization and innovation node, the connection approach and manufacturing process are smooth to control the satisfactory of technology.Steel construction projectSteel projects in China
  Contact Now
Basic InstructionRecently, the provincial Xiaoqing River comprehensive management leading group came to our city to supervise and inspect the comprehensive management of ecological environment in Xiaoqing River Basin. Vice Mayor Wang Xinwen attended the event.Site DisplayConstruction Process
  Contact Now
Basic InstructionIt is mentioned that due to the fact that september 2021, the low-carbon era control crew of beijing college of technology has taken the lead and cooperated with eight devices, along with the national pace skating corridor, tsinghua college, beijing college of aeronautics and astronautics, hefei institute of fabric sciences of the chinese language academy of sciences, shandong guoshun lvjian era co., ltd., beijing zhongchuang carbon investment era co., ltd., beijing green exchange co., ltd.
  Contact Now
Basic InstructionIt is reported that since September 2021, the low-carbon technology management team of Beijing University of technology has taken the lead and cooperated with 8 units, including the national speed skating hall, Tsinghua University, Beijing University of Aeronautics and Astronautics, Hefei Institute of material sciences of the Chinese Academy of Sciences, Shandong Guoshun Lvjian Technology Co., Ltd., Beijing Zhongchuang carbon investment Technology Co., Ltd., Beijing Green Exchange Co., Ltd.
  Contact Now
Basic InstructionIt's miles mentioned that because september 2021, the low-carbon generation control team of beijing college of technology has taken the lead and cooperated with 8 devices, which includes the countrywide velocity skating corridor, tsinghua university, beijing college of aeronautics and astronautics, hefei institute of cloth sciences of the chinese language academy of sciences, shandong guoshun lvjian technology co., ltd., beijing zhongchuang carbon investment era co., ltd., beijing green exchange co., ltd.
  Contact Now
Basic InstructionThe project team of Beijing Institute of technology independently designed and developed the "measure calculate control seek" technology system of carbon emission, successfully developed the Winter Olympic carbon measurement platform, integrated the human machine material environment data monitoring, carbon emission accounting, evaluation and control functions related to the Winter Olympic carbon emission, carried out the "carbon inventory", scientifically quantified the emission reduction contribution of various technologies, and realized the evaluation of
  Contact Now
Basic InstructionIt is mentioned that due to the fact september 2021, the low-carbon era control team of beijing college of generation has taken the lead and cooperated with eight units, including the countrywide velocity skating hall, tsinghua college, beijing college of aeronautics and astronautics, hefei institute of material sciences of the chinese language academy of sciences, shandong guoshun lvjian generation co., ltd., beijing zhongchuang carbon investment era co., ltd., beijing inexperienced trade co., ltd.
  Contact Now
TypesSome common types of steel buildings are "straight-walled" and "arch," or Nissen or Quonset hut. Further, the structural type may be classed as clear span or multiple span. A clear span building does not have structural supports (e.g. columns) in the interior occupied space.Straight-walled and arch type refer to the outside shape of the building. More generally, these are both structural arch forms if they rely on a rigid frame structure.
  Contact Now
Steel structure is a natural fabricated structure, but not all steel structures are fabricated buildings, especially not good fabricated buildings. So what kind of steel structure building can be considered as a good prefabricated building?
  Contact Now
Basic InstructionIt's far stated that because september 2021, the low-carbon generation manipulate crew of beijing university of technology has taken the lead and cooperated with eight devices, which incorporates the countrywide speed skating hall, tsinghua university, beijing college of aeronautics and astronautics, hefei institute of material sciences of the chinese language academy of sciences, shandong guoshun lvjian generation co., ltd., beijing zhongchuang carbon funding generation co., ltd., beijing green trade co., ltd.
  Contact Now
Benefits of Interarch steel framing for Educational Buildings1.Flexibility in construction and aesthetic look2.Large grid span as per class room requirement.3.Low lifetime maintenance cost and durability.4.Easily expandable for growing need with the time.5.Faster construction resulting early occupancy.
  Contact Now
    Function, appearance and practical value are the standards that people use when choosing building materials.
  Contact Now
Product application in airport case show
  Contact Now
Prefabricated Steel Bridges:Prefabricated steel bridges offer numerous advantages in the field of bridge construction.Firstly, prefabricated steel bridges provide a high level of quality control. Since the components are manufactured in controlled conditions, such as factories or precast yards, the quality of materials, manufacturing processes, and construction quality can be better controlled.
  Contact Now
Basic InstructionThis project reflects that our company has a mature industrial chain in undertaking international projects, including design, production and installation, and conforms to local standards. It also indicates that our business is steadily moving forward to the world!Under Construction
  Contact Now
IntroduceFlue gasoline desulfurization and denitration era is a boiler flue gas purification technology implemented to the chemical enterprise of multi nitrogen oxide and sulfur oxide era. nitrogen oxides and sulfur oxides are one of the predominant resources of air pollution. therefore, the utility of this era has many benefits for ambient air purification.
  Contact Now
Basic InstructionDart is a public transportation gadget primarily based on public transportation. it connects the suburb of dar es salaam with the critical enterprise district. the center started out operation in may 2016. the primary section of production turned into completed in december 2015, with a complete price of 159.6 million euros, funded via the african improvement bank, the arena financial institution and the tanzanian authorities.
  Contact Now
Relate News
Recently, the 2022 cost management conference of the group company with the theme of "forcing cost reduction to achieve lean, high-quality and high-speed sustainable development" was held in the publicity and education center on the 8th floor of the headquarters.
Recently, the Third Forum on the Coordinated Development of the Belt and Road Initiative and the Building of a Manufacturing Powerhouse and the 2022 China Industrial Carbon Summit Forum were held in Hainan Province. At the meeting, the list of "the first Chinese industrial carbon peak 'leader' enterprises" was released, and a total of 42 outstanding enterprises were selected.
On the afternoon of May 13, 2022, dailongcheng, member of the Standing Committee of the CPC Municipal Committee, director of the publicity department, Secretary of the Education Working Committee of the CPC Municipal Committee, and other leaders visited Guoshun group to carry out research.
On June 30, 2022, nearly 40 new employees came to the group headquarters to jointly participate in the 2022 youth plan growth training camp of Guoshun group for a period of 10 days.
    Jointly sponsored by Shandong Housing and Urban-Rural Development Department and Jinan Municipal People's Government, jointly undertaken by Jinan Housing and Urban-Rural Development Bureau and Jinan New And Old Energy Conversion Zone, the 5th Shandong Green Building and Building Energy Saving New Technology Products Expo was grandly opened in Shandong International Convention and Exhibition Center.     "Promote green development in urban and rural areas and create a better and livable life".
In 2021, the results of the selection of "2020 World's Best Stadium" initiated by the world-renowned professional stadium data website StadiumDB will be announced. The outstanding performance in terms of value, functionality and innovation was selected by the jury of the expert group of architects and was selected as the 20th place in the "Best Stadium of 2020".
       The stadium project is located in the west district of the starting area for the transformation of old and new kinetic energy in Jinan city, Shandong Province, with a total construction area of 9,824 square meters, including 7,124.84 square meters above ground and 2,698.15 square meters underground. The building height is 20.60 meters, the height is 4.5 meters, and the local height is 11 meters.     Guoshun is the general contractor for the construction of this project.
In November 2024, Guoshun Group was awarded the prestigious ACRS 3679.2 certification for steel products, becoming a leading company in the field of welded H-shaped steel and the first Chinese company to achieve this certification.
Recently, Mr. Shen Meng and Mr. Chen Weiming from the energy and environmental policy research center of Beijing University of technology led members of the project team to visit Guoshun group for investigation. Feng Chao, deputy general manager of Guoshun group, and Wang Zhongcai, director of the comprehensive Department of Guoshun green construction, accompanied the investigation.The project team went to the "integrated development of primary, secondary and tertiary industries" zero carbon demonstration park being built by Guoshun group for on-the-spot investigation.
Jinan Changqing District National Fitness Center Reconstruction Project is located in the west of Changqing District People's Court and north of Qinghe Street, which is a key construction project in Changqing District. Jinan Changqing District Education and Sports Bureau invested about 140 million yuan to build Changqing District National Fitness Center, with a total construction area of 21,772.21 square meters, including 16,092.96 square meters above ground, 5,679.25 square meters underground and 23.5 meters high.