Welding H-beam-manufacture,factory,supplier from China

(Total 24 Products for Welding H-beam)
Composition structure    Welding robot mainly includes robot and welding equipment. The robot is composed of the robot body and the control cabinet (hardware and software).        Welding equipment, such as arc welding and spot welding, is composed of welding power supply (including its control system), wire feeder (arc welding), welding gun (clamp), etc.
  Contact Now
H-section steel is a kind of economic section high-efficiency profile with more optimized section area distribution and more reasonable strength weight ratio. It is named after its section is the same as the English letter "H". Since all parts of H-shaped steel are arranged at right angles, H-shaped steel has been widely used for its advantages of strong bending resistance, simple construction, cost saving and light structure weight in all directions.
  Contact Now
TypesSome common types of steel buildings are "straight-walled" and "arch," or Nissen or Quonset hut. Further, the structural type may be classed as clear span or multiple span. A clear span building does not have structural supports (e.g. columns) in the interior occupied space.Straight-walled and arch type refer to the outside shape of the building. More generally, these are both structural arch forms if they rely on a rigid frame structure.
  Contact Now
Basic InstructionThe metal shape fabrication is complying with CE-Exc3 certification and we will offer you the welding metal shape with govt standard: Welds AS/NZ1554.1/AS1554.5;AWS D1.1/D1.3/D1.5/D1.6; EN1090-2.Steel construction projectTanzania steel bridgeSteel projects in China
  Contact Now
Composite wear-resistant plate has the characteristics of high wear resistance, impact resistance and easy processing. It can be connected with other structural parts by welding, plug welding and bolt connection. It is widely used in ports, docks, metallurgy, cement, coal, power, mines, steel, building materials, bricks and other industries.
  Contact Now
Basic InstructionThe metal shape fabrication is complying with CE-Exc3 certification and we will offer you the welding metal shape with govt standard: Welds AS/NZ1554.1/AS1554.5;AWS D1.1/D1.3/D1.5/D1.6; EN1090-2.Steel construction projectTanzania steel bridgeSteel projects in China
  Contact Now
Basic InstructionOur green assembled steel structure technology system uses improved node connection technology. We fully take into account the requirements of residential functions and easy decoration in this limited space of the house, and there is no longer the traditional steel structure and some concrete structure of the convex beam phenomenon.
  Contact Now
Basic InstructionThe steel structure fabrication is complying with CE-Exc3 certification and we can provide you the welding steel structure with executive standard: Welds AS/NZ1554.1/AS1554.5;AWS D1.1/D1.3/D1.5/D1.6; EN1090-2.Steel construction projectAustralia steel bridgeSteel projects in China
  Contact Now
IntroduceMetallic structure platform is a structural platform composed of metal material, which is one of the primary types of building structure of the platform.the shape is especially composed of steel beam, metal column, metallic truss and different additives fabricated from type steel and metal plate, and adopts silanization, pure manganese phosphorization, washing and drying, galvanizing and different rust elimination and rust prevention generation.welds, bolts or rivets are commonly used between the individuals or additives.because of its mild weight and simple construction, it's mil
  Contact Now
Basic InstructionThe steel structure fabrication is complying with CE-Exc3 certification and we can provide you the welding steel structure with executive standard: Welds AS/NZ1554.1/AS1554.5;AWS D1.1/D1.3/D1.5/D1.6; EN1090-2.Steel construction projectAustralia steel bridgeSteel projects in China
  Contact Now
Basic InstructionWe completely remember the necessities of residential features and clean decoration on this restricted space of the residence, and there is now not the conventional metal structure and some concrete shape of the convex beam phenomenon. after the optimization and innovation node, the connection approach and manufacturing process are smooth to control the satisfactory of technology.Steel construction projectSteel projects in China
  Contact Now
Basic InstructionWe fully take into account the requirements of residential functions and easy decoration in this limited space of the house, and there is no longer the traditional steel structure and some concrete structure of the convex beam phenomenon. After the optimization and innovation node, the connection method and production process are easy to control the quality of technology.Steel construction projectSteel projects in China
  Contact Now
IntroduceSteel structure platform is a structural platform composed of steel material, which is one of the main types of building structure of the platform.The structure is mainly composed of steel beam, steel column, steel truss and other components made of type steel and steel plate, and adopts silanization, pure manganese phosphorization, washing and drying, galvanizing and other rust removal and rust prevention technology.Welds, bolts or rivets are usually used between the members or components.Because of its light weight and simple construction, it is widely used in platform engineering p
  Contact Now
Basic InstructionOur inexperienced assembled metallic shape era device makes use of progressed node connection era. We completely don't forget the necessities of residential capabilities and smooth ornament on this confined area of the house, and there's now not the conventional metallic shape and a few concrete shape of the convex beam phenomenon.
  Contact Now
IntroduceMetallic shape platform is a structural platform composed of metal cloth, that's one of the number one forms of building structure of the platform.the form is especially composed of steel beam, metallic column, metallic truss and one-of-a-kind additives made from type steel and metal plate, and adopts silanization, natural manganese phosphorization, washing and drying, galvanizing and one-of-a-kind rust removal and rust prevention era.welds, bolts or rivets are typically used among the people or additives.due to its mild weight and easy creation, it's miles widely used in plat
  Contact Now
InstructionFlue gasoline desulfurization and denitration technology is a boiler flue fuel purification technology carried out to the chemical industry of multi nitrogen oxide and sulfur oxide generation. nitrogen oxides and sulfur oxides are one of the principal assets of air pollutants. consequently, the application of this era has many advantages for ambient air purification.
  Contact Now
InstructionFlue gas desulfurization and denitration generation is a boiler flue gasoline purification technology completed to the chemical industry of multi nitrogen oxide and sulfur oxide technology. nitrogen oxides and sulfur oxides are one of the foremost property of air pollutants. therefore, the software of this era has many benefits for ambient air purification.
  Contact Now
They have lots of advantages:Energy saving and environmental protection, using light steel, can be recycled 100%, breaking the traditional demolition and construction pollution;  Windproof and seismic, steel structure housing has high seismic performance, can withstand hurricanes and snowstorms and other natural disasters;  Sound insulation and fire prevention;  High aluminized zinc material, strong corrosion resistance, structural life is much longer than brick and concrete buildings;  Save time limit;  The construction environment is less affected by climate conditio
  Contact Now
Basic InstructionIt is mentioned that due to the fact september 2021, the low-carbon era control team of beijing college of generation has taken the lead and cooperated with eight units, including the countrywide velocity skating hall, tsinghua college, beijing college of aeronautics and astronautics, hefei institute of material sciences of the chinese language academy of sciences, shandong guoshun lvjian generation co., ltd., beijing zhongchuang carbon investment era co., ltd., beijing inexperienced trade co., ltd.
  Contact Now
Basic InstructionIt's miles mentioned that because september 2021, the low-carbon generation control team of beijing college of technology has taken the lead and cooperated with 8 devices, which includes the countrywide velocity skating corridor, tsinghua university, beijing college of aeronautics and astronautics, hefei institute of cloth sciences of the chinese language academy of sciences, shandong guoshun lvjian technology co., ltd., beijing zhongchuang carbon investment era co., ltd., beijing green exchange co., ltd.
  Contact Now
Basic InstructionIt is reported that since September 2021, the low-carbon technology management team of Beijing University of technology has taken the lead and cooperated with 8 units, including the national speed skating hall, Tsinghua University, Beijing University of Aeronautics and Astronautics, Hefei Institute of material sciences of the Chinese Academy of Sciences, Shandong Guoshun Lvjian Technology Co., Ltd., Beijing Zhongchuang carbon investment Technology Co., Ltd., Beijing Green Exchange Co., Ltd.
  Contact Now
Basic InstructionThe project team of Beijing Institute of technology independently designed and developed the "measure calculate control seek" technology system of carbon emission, successfully developed the Winter Olympic carbon measurement platform, integrated the human machine material environment data monitoring, carbon emission accounting, evaluation and control functions related to the Winter Olympic carbon emission, carried out the "carbon inventory", scientifically quantified the emission reduction contribution of various technologies, and realized the evaluation of
  Contact Now
Basic InstructionIt is mentioned that due to the fact that september 2021, the low-carbon era control crew of beijing college of technology has taken the lead and cooperated with eight devices, along with the national pace skating corridor, tsinghua college, beijing college of aeronautics and astronautics, hefei institute of fabric sciences of the chinese language academy of sciences, shandong guoshun lvjian era co., ltd., beijing zhongchuang carbon investment era co., ltd., beijing green exchange co., ltd.
  Contact Now
Basic InstructionIt is mentioned that due to the fact september 2021, the low-carbon era control team of beijing college of generation has taken the lead and cooperated with eight units, including the countrywide velocity skating hall, tsinghua college, beijing college of aeronautics and astronautics, hefei institute of material sciences of the chinese language academy of sciences, shandong guoshun lvjian generation co., ltd., beijing zhongchuang carbon investment era co., ltd., beijing inexperienced trade co., ltd.
  Contact Now
Relate News
A few days ago, the steel beam hoisting construction of Bandri railway overpass bridge was completed for the bid section 1 project of phase II BRT project in Tashi, Tanzania.The upper part of the overpass is composed of steel structure I-beams and reinforced concrete bridge deck, which are spliced by 126 I-steel beams, with a total length of 80m.
In November 2024, Guoshun Group was awarded the prestigious ACRS 3679.2 certification for steel products, becoming a leading company in the field of welded H-shaped steel and the first Chinese company to achieve this certification.
In 2021, the results of the selection of "2020 World's Best Stadium" initiated by the world-renowned professional stadium data website StadiumDB will be announced. The outstanding performance in terms of value, functionality and innovation was selected by the jury of the expert group of architects and was selected as the 20th place in the "Best Stadium of 2020".
       The stadium project is located in the west district of the starting area for the transformation of old and new kinetic energy in Jinan city, Shandong Province, with a total construction area of 9,824 square meters, including 7,124.84 square meters above ground and 2,698.15 square meters underground. The building height is 20.60 meters, the height is 4.5 meters, and the local height is 11 meters.     Guoshun is the general contractor for the construction of this project.
Recently, Guoshun Group won the top 100 private enterprises in Jinan, and the top ten high-end equipment and intelligent manufacturing industries! Zhang Lianbo, member of the party group of Jinan Private Economic Development Bureau, and Meng Haibo, member of the party group of the Municipal Federation of Industry and Commerce, attended the awarding ceremony of Changqing District. Sun Deshan, chairman of Guoshun Group, was invited to attend and speak.Guoshun Group has always insisted on leading the development of the industry driven by technological innovation.
    Recently, the "industrial flue gas multi pollutant ultra low emission Engineering Research Center" led by Guoshun group was recognized as the engineering research center of Shandong Province.
On June 30, 2022, nearly 40 new employees came to the group headquarters to jointly participate in the 2022 youth plan growth training camp of Guoshun group for a period of 10 days.
  Recently, two rod-arch Bridges in the first phase of the municipal project in Cuizhai South Area of Jinan starting Area have completed the main construction after overall careful planning and careful deployment, laying a foundation for the full opening of municipal roads in this area.   According to the introduction, the first phase of the municipal project in the south area of Cuizhai contains 9 roads, with a total length of 12.457 kilometers, including Cuiqing Road, Cuiqing Branch Road, Trunk Road 1, Jieying Road, North Boundary Road, Hengshi Road, City Exhibition Hall Ring
In order to enhance the front-line employees' in-depth understanding of the group company, improve the cohesion of employees, and enhance the sense of belonging of Guoshun people, from June 20 to June 22, the operation management head office held a training + group construction activity with the theme of "gratitude meets, cohesion Guoshun".
Recently, the main construction of kiwar Road Pedestrian Overpass of bid section 1 of Tanzanian BRT phase II project was completed.In order to ensure the smooth construction of the overpass, the project department developed a detailed construction scheme before construction, and conducted pre job training for all construction personnel to strictly control the quality.