The report of Chile's National Daily described the project as "of Chinese descent", which refers to the fully assembled steel structure technology of Guoshun group with an assembly degree of more than 95%. There is "no welding point on site", Xie liangtao said. "It uses technology that has never been used before. The whole structure of the stadium is integrated with the theme of prefabrication," Chile's national daily said.
Basic Instruction
The complete process supervision and inspection of the assignment changed into completed with the aid of the international well-known bureau veritas. the layout, production and full assembly offerings of guoshun organization had been evaluated as "very glad" by using the owner icafal ingenier í a y constructi ó n s.a. (the 6th largest standard contractor in chile and rated because the countrywide champion of chilean creation sustainable development business enterprise through the chilean residence of representatives).
Site Display
Submitted successfully
We will contact you as soon as possible