The report of Chile's National Daily described the project as "of Chinese descent", which refers to the fully assembled steel structure technology of Guoshun group with an assembly degree of more than 95%. There is "no welding point on site", Xie liangtao said. "It uses technology that has never been used before. The whole structure of the stadium is integrated with the theme of prefabrication," Chile's national daily said.
Basic Instruction
The whole process supervision and inspection of the project was completed by the international well-known bureau veritas. The design, production and full assembly services of Guoshun group were evaluated as "very satisfied" by the owner icafal Ingenier í a Y constructi ó n S.A. (the sixth largest general contractor in Chile and rated as the national champion of Chilean construction sustainable development company by the Chilean house of Representatives).
Site Display
Submitted successfully
We will contact you as soon as possible