Basic InstructionGuoshun Group signed a contract with Chile Otero company on December 13, 2018, started shipping on March 15, 2019, and shipped the last batch on May 7, 2019. A total of eight batches were shipped by sea, 58 40 foot high cabinets and 383 tons of steel structures. On September 23,