This project reflects that our company has a mature industrial chain in undertaking international projects, including design, production and installation, and conforms to local standards. It also indicates that our business is steadily moving forward to the world!
Basic Instruction
Shandong GuoShun International trade co., ltd. AND Afghan ARYANA NAWEEN BERADRAN CONSTRUCTION AND ROAD BUILDING COMPANY AFN ACCT signed a contract for the steel structure Bridges on June 22, 2018. Among them, the fabrication of steel structure Bridges and the on-site guidance and installation by engineers were completed by ShanDong GuoShun Construction group co., Ltd. Located in kunduz province, Afghanistan, the bridge has a total length of 111 meters and a span of 5 meters,Forty-four meters of it were blown up during the fighting with assistance from the German Government.
Before Construction
In The Workshop
Under Construction
The geographical position due to the project forms of political unrest and transport is relatively difficult, GuoShun Group overcome all difficulties, 30 days to complete the deepening components design, raw material purchase, processing and packaging, 30 days the goods transportation from the factory to the construction site, and use of 10 days time appointed two engineers at the scene to guide the installation and the owner of this project are obtained high praise and recognition.
Submitted successfully
We will contact you as soon as possible